A new KDS station
Drop, mount and screen in place, so the station is ready when you add it to your routing.
Field services · Toast
Toast’s own installers do not run Ethernet, mount screens on walls or work in a site still under construction. We do that part: the cable, the mounts, the kitchen screens and the network, finished and tested before Toast arrives.
Site readiness
Toast publishes its readiness rules openly. Every item below comes from its support site, checked in November 2026, beside the work we do to meet it.
| Toast requirement | What we do |
|---|---|
| Ethernet terminated before install, Cat5e or Cat6, RJ45 jacks to T568B, runs under 300 feet | Pull, terminate and test every drop, and label each one by station |
| Most devices wired, including standalone printers, KDS screens, kiosks and access points | A drop per wired device, plus a switch where the router runs short of ports |
| A power outlet within six feet of the router and of each terminal and printer | Map outlets on a walkthrough and flag every gap to your electrician |
| All wall, pole and counter mounts in place before install | Fit the mounts and route cable through them so nothing hangs loose |
| Access points mounted no higher than 10 feet by Toast’s onsite team | Mount access points at the height the room needs, with our own ladders |
| No install while the location is in active construction | Work around the contractor and sign the site off as ready |
Sources: Toast’s Site Readiness Guide and Onboarding Rates and Fees. Toast changes these pages, so check them before you book.
The cost of not being ready
Toast’s published US rates, as listed in November 2026, put a price on every gap a restaurant leaves for install day. Doing the physical work first costs less than paying for it twice.
On the day
Whether Toast sends someone or you chose remote onboarding, these are the devices we position, cable and power.
After go-live
Restaurants change. A patio opens, a second bar station goes in, the kitchen moves its expo. Each change needs cable and mounts before the new device works.
Drop, mount and screen in place, so the station is ready when you add it to your routing.
A coverage check on the floor and patio, then an access point where the gaps are.
The same readiness work at the new site, scheduled around the build and the opening date.
Common questions
No. Toast’s onboarding guide states that its installation resources do not run Ethernet cables, mount devices on walls or build menus on site. That work has to be finished before the install appointment, by your contractor or by us.
Toast’s Site Readiness Guide asks for Cat5e or Cat6, terminated in RJ45 jacks wired to T568B, with each run under 300 feet. It says the install will not go ahead if the cable is below Cat5e.
Toast’s published rates list a $500 fee when the site is not ready and $50 for each cable termination it has to make on site. Getting the cabling, power and mounts done first avoids both, and avoids losing the slot.
Yes. With remote onboarding Toast configures the account from a distance, and the hardware still has to be physically placed, cabled and powered. We do that part and test each device while your Toast contact is on the phone.
We do not build menus. The menu belongs to your Toast onboarding. Our work is the physical layer: cable, power, mounts, network, device placement and kitchen screen positioning.
Related services
Station, Mini, Flex and kitchen displays
Register, Terminal, Kiosk and KDS
PIN pad swaps for franchise lanes
Workstations, CAPS and network for hotels and venues
Hub, card readers and printers for retail
Terminals and store server for restaurant chains
On-site installs for Shift4 merchants and partners
A skilled technician for your ticket
Drops, racks and Wi-Fi for the counter
NeuralPath Dynamics is an independent installer. We are not affiliated with, endorsed by or an authorized partner of the brands named on this page. Toast is a trademark of Toast, Inc.
Next step
Send us the floor plan or a few photos, the device list and your install date. We will quote the cabling and mounts per station.