Field services · Data center

Data center fiber installation and testing

Fiber technicians for enterprise data centers and colocation halls. We route, splice, terminate and test high-density fiber, then hand back a patch record you can trust, without disturbing the live rows around us.

  • MPO/MTP & LC
  • Tier 1 & Tier 2 testing
  • Live environments

What we do

From trunk to tested port

Uptime depends on fiber nobody looks at until it fails. We install it so the next person can read it, trace it and trust its numbers.

01 · High-density deployment

Trunks, cassettes and patch fields, routed and dressed

We pull and dress fiber trunks and patch cords through overhead pathways, underfloor trays and cabinet managers, keeping bend radius and airflow intact and every run where the drawing says it is.

  • MPO/MTP trunks, breakout harnesses and LC cassettes
  • High-density patch fields in racks and cabinets
  • Overhead ladder, fiber raceway and underfloor tray routing
  • Cable management that keeps intakes and exhausts clear
  • Labeling at both ends of every trunk, cassette and cord
A technician connecting cables in a server rack
Illustrative photo, not a client site.

02 · Splicing & termination

Fusion splicing and terminations at the panel

On-site fusion splicing of pigtails and trunks into distribution frames and fiber panels, plus mechanical terminations where the design calls for them. Splice trays are laid out neatly and slack is stored, not stuffed.

  • Fusion splicing into panels, enclosures and distribution frames
  • Mechanical and field-installable connector terminations
  • Single-mode and multimode, including OM4 and OS2
  • Splice loss recorded for every fusion splice
Link test record Sample scope
Link A04-12 to C11-07MPO-12 trunk, OS2, 38 m
Tier 1
Insertion lossMeasured against the agreed loss budget
Pass
PolarityMethod B, verified end to end
Pass
End-face inspectionBoth ends, images saved
Pass

Testing

Every link tested before handover

You choose the level of testing for each link. Either way, the results are saved per link, named to your port scheme and checked against the loss budget agreed before the work starts.

Fiber test levels we run in data centers, and what each one gives you.
TestEquipmentWhat it measuresWhen to use it
End-face inspectionFiber inspection scopeContamination and damage on each connector, cleaned and inspected again until it passesBefore every mating, on every connector
Tier 1Optical loss test set or power meter and light sourceInsertion loss, length and polarity, checked against the loss budgetEvery new or moved link
Tier 2OTDRLoss and reflectance at each connector and splice along the link, so a fault can be locatedBackbone trunks, spliced links and fault finding

Polarity

Transmit meets receive, every time

Most new MPO links that fail on day one fail on polarity, not loss. We confirm your method before ordering cords and verify it on every link after install.

Method A

A straight-through trunk. The fiber pairs are crossed in a patch cord at one end of the link only.

Method B

A key-up to key-up trunk that flips the fiber order, so the same patch cord type works at both ends.

Method C

A trunk with each fiber pair crossed inside it, so standard patch cords are used at both ends.

Methods A, B and C are the MPO connectivity methods defined in the TIA-568 standards. Mixing components from different methods is the usual cause of a dark link.

Working in live halls

Your change process, followed to the letter

Data center work happens next to equipment that cannot go down. We work inside your change windows and method of procedure, and nothing is touched that is not on the approved change.

  • Work booked through your change management process and windows
  • Hot and cold aisle containment kept closed and intact
  • ESD precautions at every rack and cabinet
  • Laser safety: no looking into live ports, caps on unused ones
  • Escorted access, site badging and your site rules respected
  • Packaging and offcuts removed from the hall every shift
A patch panel with terminated network cables
Illustrative photo, not a client site.

Documentation

A patch record that matches the floor

Connectivity is only as good as its record. We map every port-to-port connection in your AIM or DCIM tool, or in a patch matrix if you have no tool, and attach the test results to each link.

  • Port-to-port mapping in AIM or DCIM software
  • Patch matrices and as-built cabinet elevations
  • Test results filed per link under your naming scheme
  • Photos of each patch field before and after

Who sends us fiber work

Hands on site for your fiber program

We work directly for data center owners, or as the on-site team for a company whose engineers are somewhere else.

Enterprise data centers

New rows, capacity adds and migrations in a company’s own halls.

Colocation providers

Cross-connects, meet-me room work and customer cage fit-outs.

Integrators & MSPs

Technicians on site for a design your own engineers produced.

Next step

Send us the fiber scope

The site, the link count, the components and the test level you need, plus your change window. We will reply with a fixed price and a crew schedule.